Partner Intergrations
Production - Domino
Job instructions for Domino machines
Job instructions and scheduling
The CERM - Domino integration has the purpose of sending job instructions to the Domino DFE (Digital Front End) according to the standard JDF-JMF interface.
The print job in question is automatically set up on the Domino machine and appears in the printing queue, with all relevant information about print quantities, digital media and references to artwork files.
Automating machine configuration and optimizing output for waste management
Subsequently, the Domino machine adjusts its settings and configurations before starting and monitors its output. The submitted job instructions out of the CERM MIS contain all information about of the exact material waste and over-production in order to produce just enough semi-finished goods for the required finishing steps.
Job instructions and Shopfloor Data Collection
Job instructions contain a specific set of data and are therefore the core foundation of Shopfloor Data Collection (SFDC). The Domino machine returns real-time data via JMF messages to the CERM MIS. This includes counter data for material consumption, ink consumption and time registration.